He included that Period two would protect the stretch through the Lekki 2nd toll gate to the Ajah under-bridge and can be divided into four sections. “Motorists from Ajah inward Lekki are going to be diverted to at least one lane though repairs are ongoing on the opposite lane,” Osiyemi https://bullk541ehk3.hazeronwiki.com/user