Initially, the Jai Hind metro station was prepared to become elevated. On the other hand, the AAI objected that the elevated stretch up into the airport may pose a threat to plane, Therefore the route was more reworked plus the station was shifted underground, 150 m with the Airport terminal setting https://reidhfaup.digitollblog.com/33012321/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf