The 25mm thick weighty metal tube is pushed While using the end closed by a steel shoe. On achieving the necessary driving resistance, an entire duration cage is lowered in on the tube and stuffed with significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupilesinbanglade93073.bloginwi.com/66275181/the-best-side-of-cast-in-situ-piles-in-dhaka